Is your battery on the approved list? The 2027 expiry and SA TS 5398, explained
As at 10 November 2026, 3,619 of the 3,623 battery entries on the Clean Energy Council’s approved list are Best Practice Guide listings that expire by 31 December 2027. From 1 January 2027, new listings must be certified to SA TS 5398. For the federal discount, a battery has to be listed at the time it is installed.
New, 25 November 2026: the Clean Energy Regulator’s copy of the list dated 23 November 2026 held 3,789 entries. Five carried an expiry date after 2027: SAJ’s four SA TS 5398 entries, and EcoFlow’s OCEAN 2 8 kWh battery, listed on 17 November with an expiry of 17 November 2029. See every battery newly listed in 2026.
Written by Juan Flinn, Content Editor · Reviewed by the Mission Green Energy Team · Updated 25 November 2026
What changed,
and which dates matter?
The Clean Energy Council is phasing in a new battery safety specification over two years.
Standards Australia published SA TS 5398, Electrical Energy Storage Equipment – Safety Requirements, in October 2025. It replaces the 2018 Best Practice Guide that the Clean Energy Council (CEC) has used to decide which batteries go on its approved list, the list the federal battery discount and the electricity networks rely on. The CEC set out the changeover on its transition page.
| Date | What happens |
|---|---|
| 1 January 2026 | New applications accepted under either SA TS 5398 or the Best Practice Guide. Best Practice Guide listings get an expiry no later than 31 December 2027. SA TS 5398 listings get three years from approval, or less if the product’s certificate expires first. |
| January 2026 | Expiry dates for more than 700 existing products brought forward to 31 December 2027. |
| 1 January 2027 | The CEC accepts new battery applications only with certification to SA TS 5398. |
| 31 December 2027 | Every remaining Best Practice Guide listing expires from the approved list. |
Two things the dates do not say. First, 31 December 2027 is the latest date, not the date every listing ends: on 10 November 2026, 354 entries on the list expire earlier than that, and 59 expire before the end of 2026. Second, the CEC notes that networks, electrical safety regulators and government programs may choose to require SA TS 5398 sooner than it does.
What changes in the specification itself, according to the CEC: rules for modular battery assemblies and their parts, room for lead-acid and future chemistries, and one main compliance method in place of the four the old guide allowed. New applications also need a certificate of conformity under the RECS scheme and the Electrical Equipment Safety System.
3,619 of 3,623
Entries on the CEC battery list on 10 November 2026. All expire by 31 December 2027.
4 entries
The only batteries certified to the new specification so far, all from one maker.
354 entries
Listings that end before 31 December 2027. Check your model’s own date.
Already have a battery?
Does an expiry affect you?
What the rules say, and the part nobody has written down.
The rules we could find all point at the day of installation. The federal department’s eligibility page says the battery and inverter must be on the relevant CEC list “at the time of installation”. The Clean Energy Regulator (CER) requires the certificates behind the discount to be created within 12 months of the installation date. And the CEC says a product that expires from its list is no longer eligible for installation under the Small-scale Renewable Energy Scheme, and under some other programs and network requirements.
What none of them says is what happens to a battery that was listed when it went in and whose listing expires later. The CEC, CER and department pages we read on 10 November 2026 are silent on it. We found no rule that takes back a discount already paid, but no source states that in so many words either, so we will not put it more strongly than that. If it matters to you, for a VPP sign-up, a network alteration or an insurance question, ask your installer to confirm it in writing, or ask the CER directly.
One case is spelled out, and it catches people who plan to grow a battery later. When you add modules to a stackable battery, the CER says the final configuration must be on the CEC list on the date it is certified, or the added modules are not eligible. If your battery’s listing ends on 31 December 2027 and nothing replaces it, adding modules in 2028 may earn no discount. If you think you will want more capacity, ask now whether the maker plans to re-list under SA TS 5398, and get the answer in writing.
Buying from December 2026 through 2027:
what should you ask?
One question, asked about the exact model on your quote.
The question is: what is the exact CEC model number, which specification is it listed under, and what is its expiry date today? Then make sure the install date in your contract falls before that expiry, and ask what happens to the price if the install slips past it. Because the battery must be listed when it is installed, a listing that lapses between signing and install day costs you the discount.
Expiry dates are set per listing, not per brand, and they vary more than the 31 December 2027 headline suggests. From the CEC list on 10 November 2026:
| Listing on the CEC battery list | Expiry date |
|---|---|
| GoodWe Lynx Home D, model LX D5.0-10 | 17 November 2026 |
| BYD HVM series (certificate BAT-451) | 5 December 2026 |
| Sungrow SBR series (certificate BAT-474) | 30 December 2026 |
| Tesla Powerwall 3, first listing (BAT-553, approved 17 October 2024) | 17 October 2027 |
| Tesla Powerwall 3 and expansions (BAT-659) and Powerwall 3 AC (BAT-998) | 31 December 2027 |
A maker can renew or re-list a product, so these dates can change. The point is that two listings of what looks like the same battery can end ten weeks apart, so check the model number on your quote, not the brand.
A Best Practice Guide listing is still a full listing until its expiry date, and a battery installed while it is listed qualifies either way. Separately, the discount itself steps down on 1 January 2027, from 6.8 to 5.7 certificates per usable kWh; our step-down guide covers what that is worth and when rushing is a trap. Every dated change is also on our rebate deadlines calendar.
How do you check any model
in two minutes?
Use the model number from the quote, not the brand name.
- Open the CEC’s approved batteries list and search the model number. Searching a brand alone is slow: Sigenergy by itself has 2,118 entries.
- Read the entry: approved date, expiry date, usable and nominal capacity, and the compliance pathway, which shows “Best Practice Guide” or “SA TS 5398”. The discount is counted on the usable capacity in that entry (why usable matters).
- Check the inverter the same way on the approved inverters list. The department’s rules need both the battery system and the inverter listed.
- Look at the CEC’s suspensions and de-listings. Several NEOVOLT battery models were suspended from 15 September 2026 and are not eligible for certificates. Our recalls and warnings checklist covers the rest.
- If you want the version your installer’s certificate agent works from, the CER publishes the CEC battery list as a spreadsheet on its certificate creation page; the current file applies from 4 November 2026.
If the model is not on the list on install day, it earns no discount, whatever the quote says. Our STC calculator shows what a listed model is worth, and the Cheaper Home Batteries guide covers the rest of the rules.
Approved list or “compatible battery” list:
which one counts?
Both, for different reasons.
The CEC approved list decides eligibility: the federal discount requires it, and networks rely on it for connection. An inverter maker’s compatible battery list answers a different question: which batteries that inverter will talk to and support. People search for the Deye list, for example. Deye itself has 53 battery entries on the CEC list, all under the Best Practice Guide, expiring between 1 March 2027 and 31 December 2027 (checked 10 November 2026).
So a battery can be on an inverter maker’s compatible list and earn nothing because it is not CEC listed, or be CEC listed and still not be supported by your inverter. Many listings are battery-only systems, in the CEC’s category “pre-assembled battery system”, which connect to a separately listed inverter, so check the pair. If you are adding a battery to an existing hybrid inverter, the CER accepts an inverter that is listed now or was listed when your solar was commissioned, as long as it was not removed for safety reasons or declared ineligible. Our guide to checking a battery brand walks through the compatibility check.
Who is listed under SA TS 5398
so far?
Four entries, one maker, as at 10 November 2026.
On 10 November 2026 the CEC list had four SA TS 5398 entries, all from SAJ under one certificate (BAT-1083): the EK70 HS5 and EK90 HS5 series, each in 7 kWh and 9 kWh usable versions. They were approved on 11 September 2026 and expire on 12 February 2028. That is less than three years out; the CEC caps a listing at the expiry of the product’s certificate if that comes first.
The brands we install, as listed on 10 November 2026. Every entry under these brands is a Best Practice Guide listing:
| Brand | Entries on the CEC list | Earliest expiry | Latest expiry |
|---|---|---|---|
| Tesla | 19 | 17 Oct 2027 | 31 Dec 2027 |
| Sigenergy | 2,118 | 5 Jun 2027 | 31 Dec 2027 |
| GoodWe | 25 | 17 Nov 2026 | 31 Dec 2027 |
| FoxESS | 110 | 2 Jan 2027 | 31 Dec 2027 |
| AlphaESS | 68 | 24 Feb 2027 | 31 Dec 2027 |
| Green ESS | 7 | 9 Dec 2027 | 31 Dec 2027 |
| BYD | 45 | 5 Dec 2026 | 31 Dec 2027 |
| Sungrow | 19 | 30 Dec 2026 | 31 Dec 2027 |
The GoodWe Lynx D G2 modules (GW8.3-BAT-D-G21 and GW9.0-BAT-D-G20) and the FoxESS CQ7 stacks that we quote are listed to 31 December 2027. None of these makers had an SA TS 5398 battery listing when we checked. Until a model shows on the CEC list with the SA TS 5398 pathway, any claim that it “is TS 5398 certified” is the maker’s claim, not a listing. For how we rank the batteries themselves, see best home battery 2026, and for whether one pays at all, is a home battery worth it.
The approved battery list:
your questions, answered.
SA TS 5398 is Standards Australia's technical specification for the safety of electrical energy storage equipment, published in October 2025. It replaces the 2018 Best Practice Guide as the test the Clean Energy Council uses for its approved battery list. From 1 January 2027 the CEC accepts new battery listings only under SA TS 5398, and every Best Practice Guide listing expires from the list by 31 December 2027.
Probably, unless its maker re-lists it. On 10 November 2026, 3,619 of the 3,623 entries on the Clean Energy Council's battery list were Best Practice Guide listings, and all of those expire by 31 December 2027, some of them earlier. Only four entries, all from SAJ, were listed under SA TS 5398. Search your exact model number on the CEC list to see its own expiry date.
No published rule says either way. As at 10 November 2026, the federal eligibility rules require a battery to be listed at the time of installation, and the Clean Energy Regulator requires certificates to be created within 12 months of installation. None of the CEC, CER or department pages we read says what happens when an installed battery's listing later expires. If it matters for a VPP, network change or expansion, ask your installer or the CER in writing.
Yes, if the model is still on the Clean Energy Council list on the day it is installed. Best Practice Guide listings stay valid until their own expiry date, which is 31 December 2027 at the latest and earlier for some models. The discount itself drops from 6.8 to 5.7 certificates per usable kWh on 1 January 2027, so check both the expiry date and the install date on your quote.
As at 10 November 2026, four entries on the Clean Energy Council list: SAJ's EK70 HS5 and EK90 HS5 series, each in 7 kWh and 9 kWh usable versions, approved on 11 September 2026 and expiring on 12 February 2028. No other maker had an SA TS 5398 battery listing. A maker's claim of SA TS 5398 certification only counts for the discount once it appears on the list.
Search the exact model number from your quote on the Clean Energy Council's approved batteries list, not just the brand. Note the expiry date, the usable capacity and the compliance pathway, which shows Best Practice Guide or SA TS 5398. Then check the inverter on the approved inverters list, because both must be listed at installation. As at 10 November 2026 the battery list held 3,623 entries.
No. The Clean Energy Council approved list decides whether a battery qualifies for the federal discount and for network connection. An inverter maker's compatibility list shows which batteries its inverter supports. You need both. For example, on 10 November 2026 Deye had 53 battery entries on the CEC list, all Best Practice Guide listings expiring by 31 December 2027, which is separate from any Deye compatibility list.
Where these
figures come from.
Listing counts, pathways and expiry dates were read from the Clean Energy Council’s approved battery list on 10 November 2026; rules from the CEC, the Clean Energy Regulator, the department and the Regulations as dated below. Listings change often. This is general information, not financial advice.
- Clean Energy Council — Battery specs change: transitioning to SA TS 5398 (dates, expiry rules)
- Clean Energy Council — Approved batteries list (entries, pathways and expiry dates checked 10 November 2026)
- Clean Energy Council — Recent changes to battery expiry dates (more than 700 products, January 2026)
- Clean Energy Council — Approved inverters list
- Clean Energy Council — Product suspensions and de-listings (NEOVOLT, 15 September 2026)
- DCCEEW — Cheaper Home Batteries Program eligibility (listed at the time of installation; updated 1 May 2026)
- Clean Energy Regulator — Solar batteries: requirements, stackable systems, existing inverters, STC factors (updated 29 October 2026)
- Clean Energy Regulator — Create small-scale technology certificates: 12-month window, CEC list spreadsheets (updated 9 November 2026)
- Federal Register of Legislation — Renewable Energy (Electricity) Regulations 2001, compilation of 1 May 2026, regulation 20ACA(4)